Company Cases About 500kw/1MWh containerized battery energy storage system installed in Germany for back up

500kw/1MWh containerized battery energy storage system installed in Germany for back up

2022-12-27
Latest company cases about 500kw/1MWh containerized battery energy storage system installed in Germany for back up

500kW / 1MWh On Off Grid Battery Energy Storage System Installed in Germany

The 500KW/1MWh user-side energy storage project of Shenzhen Huaxing New Energy Technology Co., Ltd. is located in Germany. The access AC voltage level of the project is 400V. The lithium iron phosphate battery pack is used as the energy storage unit. It can realize charging and discharging according to the peak and valley period of Germany, and achieve the function of peak shaving and valley filling.

 

Battlink 500kw/1MWh  containerized BESS integrated with standard LiFePo4 battery module, PCS with isolated transformer,industrial air conditioner,EMS,STS,AC distribution cabinet,DC distribution cabinet,high voltage box,fire fighting system , environmental monitoring,cabinet etc.

latest company case about 500kw/1MWh containerized battery energy storage system installed in Germany for back up  0

Production in Huaxing Factory in Shenzhen

 

 

latest company case about 500kw/1MWh containerized battery energy storage system installed in Germany for back up  1

500kw/1MWH BESS Arrived at Customer in Germany 

 

 

The energy storage system is equipped with hardware fault and software protection at the same time. The protection function configuration is complete, the protection scope overlaps, and there is no dead zone, which can ensure the system safety under various fault conditions.

 

 

BMS Protection

BMS as the first-level protection, when the battery has overcharge, over-discharge, over-current, over-temperature, excessive voltage difference, and excessive temperature difference, it will report the first-level alarm at the first time, and the charge and discharge power will be halved. When the secondary alarm occurs, the BMS sends a signal to the EMS, and the system stops charging and discharging. If the charging and discharging are continued, the third-level alarm of the BMS is triggered, and the DC side relay will act directly to stop the whole operation. At this time, the system must be manually resumed.

 

PCS protection

PCS comes with its own protection. If the system does not act after the BMS level 2 alarm, it will trigger the PCS self-protection and stop the entire system from running.

In addition, PCS is also have AC over voltage protection, AC under voltage protection, AC over current protection, AC frequency protection, surge over voltage protection, phase sequence error protection, etc.

EMS Protection

As the system management center, EMS obtains detection data through sensors and communication, makes logical judgments, and issues protection commands such as power halving and shutdown.

latest company case about 500kw/1MWh containerized battery energy storage system installed in Germany for back up  2

latest company case about 500kw/1MWh containerized battery energy storage system installed in Germany for back up  3

 

 

Each battery module have fire fighting system-Perfluorohexanone

 

latest company case about 500kw/1MWh containerized battery energy storage system installed in Germany for back up  4

 

 

Containerized Battery Energy Storage Systems(BESS) is designed to store and manage energy generated from renewable sources such as solar and wind power.Containerized BESS are a cost-effective and modular way to storage which can be easily transported and deployed in various locations

Events
Contacts
Contacts: Ms. Joan Deng
Contact Now
Mail Us