Send Message

Shenzhen Huaxing New Energy Technology Co.,Ltd joan.deng@huaxingenergy.com 86--0755-89458220

Shenzhen Huaxing New Energy Technology Co.,Ltd Company Profile
Cases
Home > Cases >
Company Cases About Total 8MWp and 7MW/14MWH BESS installation in Guinea

Total 8MWp and 7MW/14MWH BESS installation in Guinea

2024-05-10
Latest company cases about Total 8MWp and 7MW/14MWH BESS installation in Guinea

Total 8MWp and 7MW/14MWH BESS installation in Guinea

 

In Jan.2024,Huaxing shipped 8MW solar panel and 14.6MWh Battery Energy Storage system to Guinea.

 

In March,2024,Customer have received our PV and BESS.And our Huaxing send 2 engineers to guide them to install and debug the whole PV+BESS.

 

latest company case about Total 8MWp and 7MW/14MWH BESS installation in Guinea  0

 

This Battlink brand BESS provided by Shenzhen Huaxing.It adopt long cycle lithium iron phosphate batteries.After long time and several times testing.This system have over 10 years life span in extreme environment.

 

latest company case about Total 8MWp and 7MW/14MWH BESS installation in Guinea  1

 

The BESS container is a 20ft HQ using high-weather-resistant steel plates; it featured with IP55 protection level and high-strength sand and water resistance; it has an integrated with excellent EMS, thermal management, and fire fighting system, which can fully meet the power operation needs in tropical arid areas.

 

After the photovoltaic power generation base put into operation, it generate about 122,000 kWh clean electricity per day, reducing carbon dioxide emissions by about 84.16 tons. Converted into diesel power generation, based on the Guinean diesel price of 1.41$ per liter, it can save about 57,746$ per day.

 

More information about it,pls be kindly click this link  https://youtu.be/PaiqxukyK0I?si=5KdbN2JTk12DMQLt

 

Battlink#

Huaxing New Energy#

On off grid battery energy storage system#

Solar Panels #

Conatinerized BESS#

 

Events
Contacts
Contacts: Ms. Joan Deng
Contact Now
Mail Us