Send Message

Shenzhen Huaxing New Energy Technology Co.,Ltd joan.deng@huaxingenergy.com 86--0755-89458220

Shenzhen Huaxing New Energy Technology Co.,Ltd Company Profile
Cases
Home > Cases >
Company Cases About Total 8MWp and 7MW/14MWH BESS installation in Guinea

Total 8MWp and 7MW/14MWH BESS installation in Guinea

2024-05-10
Latest company cases about Total 8MWp and 7MW/14MWH BESS installation in Guinea

Total 8MWp and 7 MW/14 MWH BESS installation in Guinea

 

In January 2024, Huaxing shipped an 8MW solar panel and 14.6MWh battery energy storage system to Guinea.

 

In March 2024, customers have received our PV and BESS. And our Huaxing sent 2 engineers to guide them to install and debug the whole PV+BESS.

 

latest company case about Total 8MWp and 7MW/14MWH BESS installation in Guinea  0

 

This Battlink brand BESS is provided by Shenzhen Huaxing. It adopts long-cycle lithium iron phosphate batteries. After a long time and several times of testing.This system has over a 10-year life span in extreme environments.

 

latest company case about Total 8MWp and 7MW/14MWH BESS installation in Guinea  1

 

The BESS container is a 20-foot HQ using high-weather-resistant steel plates; it features an IP55 protection level and high-strength sand and water resistance; it has an integrated excellent EMS, thermal management, and firefighting system, which can fully meet the power operation needs in tropical arid areas.

 

After the photovoltaic power generation base is put into operation, it generates about 122,000 kWh of clean electricity per day, reducing carbon dioxide emissions by about 84.16 tons. Converted into diesel power generation, based on the Guinean diesel price of 1.41$ per liter, it can save about 57,746$ per day.

 

For more information about it, please kindly click this link: https://youtu.be/PaiqxukyK0I?si=5KdbN2JTk12DMQLt

 

Battlink#

Huaxing New Energy#

On-grid battery energy storage system#

Solar Panels #

Conatinerized BESS#

 

Events
Contacts
Contacts: Ms. Joan Deng
Contact Now
Mail Us